Project Description
Integration of the devices of an CSSD for authorised service technicians
Installation – Assembly – Setup
- Procedure for installation, assembly and setup
- Supply and disposal lines for water management
- Power supply
- Supply lines for compressed air systems
- Network connections
- Individual components and systems of the CSSD


Decommissioning – Frost protection– Dismantling – De-installation
- Individual components and systems of the CSSD LSE
- Network connections
- Supply lines for the compressed air system
- Power supply
- Supply and disposal lines for water management
Scope
- Travel cost to the training location
- Training plan and organisation
- On-site training
- Required documentation
- Certificates
Information
Duration Training
3 weeks = 120 hours à 60 minutes
Number of participants
Max. 6
Requirement for participation
Specialist for medical device reprocessing – FMA
Technical sterilisation assistant (FK III/II/I)
Documentation
Digital medium and training folder
Certificate
Authorisation
- Carrying out the integration of the devices for the respective CSSD